DEVELOPMENT (continued)          < back                             

 

Project Components

 

I-15 Freeway Corridor

I-15 is currently a six-lane freeway from Tropicana Avenue to Sloan Road.  The proposed improvements for I-15 consist of expanding the freeway to a ten-lane facility from Tropicana Avenue to Sloan Road.

Sloan Interchange

Southern most Las Vegas service interchange.  Current southern limit will become future Grand Cayman interchange based on City of Henderson Master Streets and Highways Plan.

Bermuda Road

I-15 South NEPA Document will analyze the proposed interchange.  New city street based on City of Henderson Master Streets and Highways Plan.

St. Rose Parkway

This is a new interchange to be re-constructed by NDOT as part of the St. Rose Parkway project.

Starr Avenue

I-15 South NEPA Document will analyze the proposed interchange.

Cactus Avenue

I-15 South NEPA Document will analyze the proposed interchange.

Silverado Ranch EA

Clark County Public Works to construct new interchange.  This project will be included in the I-15 NEPA Study as a traffic analysis of an existing condition.

Pebble Road Overpass

I-15 South NEPA Document will analyze the proposed interchange.

Blue Diamond Highway (SR 160)

NDOT is reconstructing this existing interchange for a new alignment to intersect with Windmill Lane at Las Vegas Boulevard.

I-215/I-15 System Interchange

I-15 South NEPA Document will analyze improvements to the existing system.

Las Vegas Boulevard South

Las Vegas Boulevard Tropicana to south of Bermuda Road would be expanded to a four-lane facility.

Tropicana Avenue Project

Exiting structure will not allow for any widening improvements on I-15 without reconstructions.  This is the current northern limit for the I-15 south NEPA Document Study.  

< back     top

 

HOME
Development
Study
Schedule
Contact Us
Related Links
Download


     I-15 South NEPA Project     

 

   Welcome